Machines Components COMPONENTS WORKSHOPMPR COMPONENTS DELIVERY TRUCK777F TORQUE CONVERTER 25.11.20COMPONENTS 25.11.20D11T FINAL DRIVE 25.11.20D11T TRANSMISSION 25.11.20793D TRASMISSION 08.12.20COMPONENTS 08.12.20D11T TRANSMISSION 08.12.203412C ENGINE 16.12.20D11T TRANSMISSION PUMP PARTS 06.01.21D11 PUSHARM KIT 29.01.21777G TRANSMISSION 12.02.21CIRCLE DRIVE 20.04.21777G FINAL DRIVE 21.05.21CAT 3456 ENGINE 25.06.21CAT 3412E ENGINE PARTS 01.07.21COMPONENTS 20.08.21 517 Mack Metroliner MPR Service Truck BONNET REPAIRS 18.11.20BONNET FITTED 20.11.20MACK SIDE 08.12.20MACK BACK 08.12.20MACK ON ITS WAY TO SITE 15.04.21 Sherman D11R MPR Dozer SHERMAN FRONT 18.11.20SHERMAN SIDE 18.11.20NEW FRONT STICKER 18.11.20SHERMAN 23.11.20HEADING OFF TO LIDDELL COAL 27.11.20HEADING OFF TO LIDDELL COAL 27.11.20 777C Watercart Nov 20 – Jan 21 DASH OF CAB 20.11.20BACK OF CAB 20.11.20FRONT OF CAB 20.11.20ISOLATION BOARD 20.11.20FRAME 20.11.20FRAME 20.11.20A FRAME BACK 23.11.20A FRAME FRONT 23.11.20FRAME WELDING 23.11.20FRAME WELDING 23.11.20FRAME WELDING 23.11.20CHASSIS REPAIRS BEFORE 27.11.20CHASSIS REPAIRS AFTER 27.11.20CHASSIS PAINTED 04.12.20REBUILDING WATERCART 04.12.20FINAL DRIVE FITTED 08.12.20CHASSIS HARNESSED INSTALLED 08.12.20BELT GUARDS FOR ENGINE SUPPLIED BY CAMERONS 10.12.20WATERTANK BEING PAINTED 10.12.20ENGINE BEING INSTALLED 14.12.20SIDE OF ENGINE 14.12.20WATERTANK BEING DELIVERED 16.12.20WATERTANK HANDRAILS INSTALLED 16.12.20INSTALLING RADIATOR 16.12.20CHASSIS REBUILD PROGRESS 18.12.20CHASSIS UPDATE 06.01.21CHASSIS UPDATE 06.01.21BLEEDING THE BRAKE 07.01.21WATER SPRAY BAR BEING ASSEMBLED 13.01.21AC BEING FIXED BY MARLIN AUTO AIR 20.01.21INSTALLING WATER TANK ON CHASSIS 21.01.21INSTALLING WATERTANK ON CHASSIS 21.01.21MPR EMPLOYEES 21.01.21 775E Service Truck Nov – Dec 20 BACK OF MODULAR 23.11.20FRONT OF MODULAR 23.11.20SERVICE TRUCK 23.11.20MODULE BACK FROM REPAIRS 09.12.20BACK TO WORK 18.12.20 793D Truck May 21 – July 21 ARRIVING AT WORKSHOP 30.05.21A-FRAME REMOVAL 03.06.21A-FRAME REMOVAL 03.06.21A-FRAME REMOVAL 03.06.21LINE BORING BY MORGAN ENGINEERING 10.06.21UPDATE 10.06.21REAR WHEELS OFF 18.06.21GOING ON BOWERS HEAVY HAULAGE TRUCK 06.07.21REMOVING THE WHEELS 06.07.21HEADING OFF 06.07.21 785C Watercart Sep 21 – Current ARRIVAL AND REMOVAL OF TYRES 15.09.21